Secure legacy field equipment · NeoCore Edge Runtime
Keep your equipment. Secure the connection.
Many RTUs and controllers still send DNP3 or Modbus traffic without encryption. NeoCore sits in front of them, in the same panel, and carries their data over TLS-secured DNP3 and IEC 104 based on IEC 62351, without replacing the devices you already rely on.
Why are legacy RTU links a risk?
DNP3, Modbus and IEC 60870-5-104 were designed for closed networks. None of them encrypts traffic or checks who sent a command. On a shared or routed network, anyone with access to the path can read measurements, and a forged or altered command can look legitimate to the device that receives it.
The IEC 62351 series addresses this. IEC 62351-5 adds authentication of critical messages, and TLS encrypts the connection itself. Many RTUs and controllers in service today support neither, and their manufacturers offer no upgrade path.
The usual answer is to replace the RTUs and PLCs. That means new hardware, rewiring, re-commissioning every point, and an outage window that a small municipality or plant often cannot find in its budget or its calendar.
Keep the equipment you have. Add a secure layer in front of it.
How does NeoCore secure an existing device?
Same panel, same wiring
Encrypted and authenticated
The device stays in service
Replace everything, or add a secure layer?
| Replace the RTUs and PLCs | Add NeoCore in front | |
|---|---|---|
| Field devices | Removed and replaced | Kept in service, unchanged |
| Field wiring and I/O | Rewired to the new device | Unchanged |
| Points and logic | Rebuilt and re-commissioned | Mapped once in NeoStudio; device logic unchanged |
| Outage | Each device is out of service during cut-over | Planned around a short network cut-over |
| Security | Depends on the new device | TLS and IEC 62351-5 on the DNP3 or IEC 104 link |
Outage and effort depend on each site. NeoTechX states the scope for your site after a survey; this table describes the approaches, not a quote.
How does a retrofit project run?
Survey
We list your devices, protocols, points and the control system at the other end, and check what it accepts.Plan
We agree the point mapping, security settings and cut-over plan with your team or your integrator.Install
A licensed electrical contractor installs the NeoCore controller. NeoCore is configured with NeoStudio.Commission
The secured link is brought up and checked frame by frame with the IEC 104 Test Tool or the master's own logs.
What does NeoCore connect to?
| Side | Protocols | Security |
|---|---|---|
| Field side (your existing devices) | Modbus RTU and TCP; DNP3 serial and TCP; IEC 60870-5-101 and -104; BACnet/IP and BACnet MS/TP; OPC UA; Siemens S7; Beckhoff ADS; IEC 62056-21 meters | Local connection inside the panel |
| Control-system side | DNP3 and IEC 60870-5-104, as outstation or master | TLS and IEC 62351-5 secure authentication Available |
| IT side, optional | MQTT, OPC UA, SQL | TLS |
While NeoCore is there: alarms after hours
Small teams cannot watch a screen all night. The same NeoCore that secures the link can watch the site.
Alarm notification
Works with your monitoring
Local logic keeps running
Who is this for?
- Small and mid-sized municipalities: water, wastewater and pump stations
- Small industry and independent manufacturers with remote sites
- Integrators maintaining RTUs that their manufacturer no longer updates
- Anyone asked by a security review to encrypt and authenticate field links
What is available, and what is in development
Available TLS and IEC 62351-5 secure authentication for DNP3 and IEC 104
Available Protocol conversion from Modbus, DNP3, BACnet and others
In development Outbound-only connectivity, hardware-backed keys and signed updates
Frequently asked questions
Can I add encryption to an old RTU without replacing it?
Yes. NeoCore Edge Runtime is designed to sit in front of an existing RTU or controller, in the same panel. The RTU keeps its local connection to NeoCore, and NeoCore carries the data to the control system over TLS-secured DNP3 or IEC 60870-5-104 with IEC 62351-5 authentication.
Why is unencrypted DNP3 or Modbus a risk?
DNP3, Modbus and IEC 60870-5-104 were designed without built-in encryption or authentication. Anyone with access to the network path can read the traffic, and a forged or altered command can look legitimate to the device. IEC 62351-5 adds authentication of critical messages, and TLS encrypts the connection.
Which protocols does NeoCore accept from legacy devices?
NeoCore reads legacy devices over Modbus RTU and TCP, DNP3 (serial and TCP), IEC 60870-5-101 and -104, BACnet/IP and BACnet MS/TP, OPC UA, Siemens S7 and Beckhoff ADS, among others. Towards the control system it serves DNP3 and IEC 60870-5-104 secured with TLS and IEC 62351-5.
Does my SCADA master need to change?
The control system at the other end must accept TLS and, where used, IEC 62351-5 secure authentication on its DNP3 or IEC 104 connection. NeoTechX checks this during the site survey and discusses the options before any work is agreed.
Who installs NeoCore?
A licensed electrical contractor installs the controller that runs NeoCore, in the existing panel or an adjacent enclosure. NeoTechX does no electrical work itself. NeoCore is configured with NeoStudio, by NeoTechX or an installation partner.
Is this certified?
NeoCore implements IEC 62351-5 secure authentication and TLS for IEC 60870-5-104 and DNP3. NeoTechX does not claim third-party certification. The IEC 104 device profile and IEC 62351-5 PICS are available on request for interoperability review.
Tell us what is in your panels.
We survey your devices and the control system they report to, and tell you what securing them would take. No obligation.
Sources
- IEC 62351-5 PICS and IEC 104 and DNP3 driver manuals
- IEC 62351 series (IEC TS 62351-3, IEC 62351-5)
- NeoTechX service catalogue v4.3, section 4.1; positioning strategy 2026-10-11
This page describes NeoTechX products and services and how they are designed. It is not an offer, warranty or guarantee of results. Capabilities marked Pilot or In development may change. Fees, performance and data-handling terms are set only in a signed agreement.